Subscribe 

Energy

Oil Ministry slashes upstream spending for 2026

Urgent austerity plan aims to cut $1.4 billion from oil field budgets nationwide in 2026 without affecting production — a warning sign of fiscal trouble for Iraq.
Oil Minister Hayyan Abdulghani (center left) and Deputy Oil Minister for Upstream Bassim Mohammed Khdair (center right) meet with Zaid Elyaseri (far left), the president of BP Iraq, in Baghdad on Jan. 26, 2026, to discuss the company's upstream plans and project expenses. (Photo credit: Oil Ministry)

Rumaila still reeling after large fire

Production at Iraq's largest field is still down by at least 120,000 bpd as repair crews contend with extensive damage from a Jan. 24 fire.

Rumaila production falls on fuel shortages

A temporary but dramatic drop in output at Iraq's most prolific oil field underscores the challenges of fighting natural reservoir decline and maintaining production.

Iraq ends 2024 with deep production cuts

Steep reduction at Rumaila brought Iraq's December production average to its lowest level in 18 months as Iraq continues to restrain output in an effort to meet OPEC-plus expectations.